Servaccomm recently won a £550,000 contract to design, manufacture and install a single-storey office accommodation block on the site of the old Ferrybridge power station in West Yorkshire, for prestigious French building material suppliers, Lafarge.
Client: Lafarge
Project: To design, manufacture and install office space and welfare facilities for the new manufacturing plant at Ferrybridge, West Yorkshire.
Building Specification: Single storey prefabricated modular office building incorporating reception area, multiple offices, accounts and administration, meeting and training rooms. Welfare facilities include locker and changing rooms with showers and WC’s, bespoke canteen area with laminate flooring and vending facilities. Gas powered water heating with full cool/heat climate control throughout the building.
Contract Value: £550k
Project Size: 1100 square metres of single storey modular building manufactured in 33 modules.
Contract Details: The design and manufacture of single storey modular office accommodation and welfare facilities. Deliver and install to the new manufacturing plant at Ferrybridge, Knottingley.
Lafarge, who boast 237 locations internationally, with an annual turnover of £1 billion, constructed a manufacturing plant for their building division on site of the old Ferrybridge ‘B‘ power station. Servaccomm were commissioned to provide office accommodation to support Lafarge's administration and operations team who run the plant.
Single-storey office accommodation was constructed in a record six weeks offsite at Servaccomm’s manufacturing site. The bespoke-finished modular building, with office space of approximately 1100 square metres, was transported and installed on prepared foundations over a period of four days.
The office accommodation now provides a uniquely designed reception area, meeting rooms, senior management offices, together with a main boardroom, toilet and washroom facilities. The building also boasts full cool/heat climate control air conditioning; IT, data and power, all contained within trunking; low energy and CATT Two lighting to all office areas.
Mike Kendall, Engineering Manager for Lafarge, concludes:
"Servaccomm were definitely the most visionary, and their submission was a genuinely innovative response to our needs. The other four applicants added little value to the brief and didn’t take care to understand Lafarge’s needs. In the end, the decision to award the contract to Servaccomm was made easy by their attention to detail and understanding of our requirements."
Servaccomm Redhall Ltd, Patrington Road, Ottringham, Hull, East Yorkshire HU12 OAD.
Tel: 01964 624444 - Fax: 01964 624455 © Servaccomm